During this period of time, there was a lot of work carried out, which took longer than expected due to the weather, but you can’t win ’em all. Here’s a list of what was done, you can see some of the work in detail in the exterior, interior, and mechanical areas of this site.
- Underside of car was rubbed down and painted with rust preventative paint and/or waxoyl
- Fuel tank was removed, cleaned up, and painted with rust preventative paint
- Suspension parts, the driveshaft, rear axle, and the prop shaft were all cleaned and painted with rust preventative paint
- All suspension points were greased and the air suspension in the rear was fixed
- All 4 brake drums were removed cleaned/painted and fitted with new cylinders and shoes
- The car was given an oil change with Gulf Competition 10w-40 racing engine oil and a K&N oil filter
- A full exhaust system was fitted, however the stock muffler was replaced with a Cherry Bomb Stateside chrome silencer
- All 4 alloy wheels were cleaned and polished
- The grill was painted to match the SS grill
- The fan was painted
- A new positive battery lead was fitted along with new positive and negative battery terminals
- The carbon filter box from a partially removed emissions system was still in the car, so that was removed and the fuel pipe that was supposed to go to that box was plugged
- The horn was fixed
- The rear bumper was straightened out
I’m sure there’s more, but that’s all I can remember at the moment

Comments are closed.